Skip to content
PolicyRoutine update

2027 Marine Corps Installation Range Control Certification Schedule

MARADMIN 497/26·October 14, 2026·Official source

The calendar-year 2027 inspection schedule for TECOM's triennial range control certifications at six installations in California and Arizona. Applies to those specific installation commands only.

This is a routine update, such as a name list, a set of results, or a recurring notice. The plain-English version is the summary above; the official text follows in full so you can find your name, number, or unit. Read it on marines.mil

Official text

R 141834Z OCT 26

MARADMIN  497/26

MSGID/GENADMIN/CG TECOM QUANTICO VA// 

SUBJ/ANNOUNCEMENT OF THE 2027 MARINE CORPS INSTALLATION RANGE

CONTROL CERTIFICATIONS SCHEDULE// 

REF/A/DOC/CMC/3 MAR 2023// 

NARR/REF A IS MCO 3550.9A WITH ADMINISTRATIVE CHANGE 1,

OPERATIONAL TRAINING RANGE CERTIFICATION-RECERTIFICATION PROGRAM//

POC1/MR. STEFAN CRAWFORD/CIV/TECOM RANGE AND TRAINING AREA

MANAGEMENT BRANCH/QUANTICO/TEL: (703)432-1396/E-MAIL:

STEFAN.CRAWFORD@USMC.MIL//

POC2/MR. JARAD OLIVER/CIV/TECOM RANGE AND TRAINING AREA MANAGEMENT

BRANCH/QUANTICO/TEL: (703)784-4433/E-MAIL: JARAD.OLIVER@USMC.MIL//

GENTEXT/REMARKS/1.  Purpose.  Per reference (a), installation range

control programs will be certified / recertified by Commanding

General (CG) Training and Education Command (TECOM), every three

years. 

2.  Background.  The installation range control certifications will

be conducted by an inspection team from CG TECOM Range and Training

Area Management (RTAM) using the certification for range control

operations checklist found on the Marine Corps Range and Training

area Management System (MCRTAMS) in the range certification module

at https:(slant slant)rtam.tecom.usmc.mil. For calendar year 2027,

the Marine Corps installation range control certification schedule 

is as follows:

Date:   location:

4  May - 5  May 2027    MCAGCC Twentynine Palms, CA

         7  May 2027    MCLB Barstow, CA

10 May - 11 May 2027    MCAS Yuma, AZ

25 May - 26 May 2027    MCB Camp Pendleton, CA

         27 May 2027    MCAS Miramar, CA

9  Jun - 10 Jun 2027    MCMWTC Bridgeport, CA

3.  Details regarding the certification schedule and inbrief will be

emailed to each installation approximately 30 days before the

planned certification visit.

4.  Scheduling conflicts will be addressed on a case-by-case basis

between the unit's leadership and the TECOM / RTAM points of contact

(POC).

5.  Installation commanders shall communicate all cancellation

requests via email to the TECOM / RTAM POC.

6.  Installation commanding officers will receive an outbrief of the

inspection results before the inspection team's departure. Official

results from RTAM will be released within 30 days from the

completion of the inspection. Should findings or discrepancies be

identified during the range control certification process, the

installation commanding officer of the range control facility will

submit a corrective action plan (CAP) to CG TECOM within 30 calendar

days following receipt of the certification report. The CAP is

required to be in naval correspondence format and provided to the

TECOM / RTAM POCs via the don task management tool (ETMS2). The CAP

shall document the corrective actions / steps taken or planned to

eliminate the cause(s) preventing the recurrence of each

discrepancy. Subsequently, every 30 calendar days a status report

from the installation range control officer will be provided to the

TECOM / RTAM POCs via email with copies sent to the installation

commander until the CAP is complete. TECOM / RTAM shall determine

when the corrective actions are sufficient to certify or recertify

the installation range control facility.

7.  The scheduled certification visits are at no cost to the

commands. Scheduled certification cancellations may require the

canceling unit to fund travel expenses for a rescheduled

certification. Technical Assist Visits (TAV) are provided to all

commands with ranges and training areas upon request via email to

the TECOM / RTAM POCs. TAVs are at no cost to commands and are

highly recommended. 

8.  This MARADMIN applies to all Marine Corps bases, stations, and

installations listed in paragraph 2 and reference (a). 

9.  Release authorized by Lieutenant General Thomas B. Savage,

DC T&E CG TECOM//
policyaccountabilityleadership
2027 Marine Corps Installation Range Control Certification Schedule — Reservable